Phase of Formwork

//Phase of Formwork
Phase of Formwork2016-12-01T13:45:55+01:00

Fase 3 STRONGFORM Phase of Formwork

In this phase the STRONGFORM system is assembled by means of pins and grooved wedges on the walls, and staples for the ceiling too.

The assembly time is about 4 hours, considering a house of 50 m2.

Along each wall is placed a rectangular profile to ensure good alignment of the formwork, which benefits the quality of the final finish.

  • Quick and easy assembly
  • Easy to use from lightweight materials
  • Fast execution