Next phase of concreting the formwork from the top, an operation that is quick and simple way is undertaken. This will fill at once both the walls and wrought housing, optimizing its performance.
To test the concrete filled and vibration, the system provides a small inspection hatches arranged in the base of the windows.
- Concreting from the top
- Walls and ceiling are filled at once
- Inspection finishing elements